Dev call 1/27/2010 minutes
minutes
Miro 3.0 status (roadmap) (was Miro 2.6)
we're really close to a release candidate now--just squaring away some issues that have popped up and letting the code bake
Miro Community 1.0 status (roadmap)
we're working on 1.0 now--probably a 4-6 week dev cycle
Ben
Fixed bugs.
Feeling great about 3.0.
Has a few more things to do, but is pretty much set for 3.0 things.
Luc
Fixed bugs for 3.0.
Worked on testing. Started seeing memory leak issues.
We can release even with the Perian issue as long as we mention the issue in the release notes.
Janet
Going through testing and bugs and keeping up with changes.
We're really close to release-candidate worthy.
Worked on performance testing and testing on OSX--lots of performance fixes in 3.0.
Will
Fixed bugs.
Paul
Worked on Miro Community post 0.9 issues.
Now working on 1.0. Looking at a 4-6 week time frame.
bugzilla
33 bugs/feature-requests created
3 bugs marked DUPLICATE
23 bugs marked FIXED